MTTR-Mean time to repair is the average time

A
between failures
B
of all part repairs
C
to get a technician on site
D
of the part repair

答案解析

正确答案:D
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following can be considered factors in the success of an SGIA?
I. Management support and commitment
II. Clear goals always established by management
III. Educating and training all personnel
IV. Recognizing and rewarding the group

单选题

The time required between the completion of each successive end product is called:

单选题

Under full absorption costing, indirect costs would be handled by which of the following methods?

单选题

Which of the following are true regarding variable costing?
I. Fixed factory overhead is not assigned to the product
II. It is acceptable for external financial reporting
III. It is beneficial for internal analysis

单选题

Based on the following information, what is the lost time factor?
Planned hours     10
Standard hours earned      8
Actual hours worked     10

单选题

In product A, the standard amount of material to be used is 20 units. After running yesterday, 22 units were used to produce product A. The 2 extra units needed are known as a(an):

单选题

WORK CENTER 210 (in standard hours)
Period    1     2     3     4     5  
PLANNED INPUT  150   150    150    150   150  
ACTUAL INPUT 150 145 130
Period     1     2     3     4     5  
PLANNED OUTPUT 180    180    180    180    150  
ACTUAL OUTPUT 185 140 160
Based on the input/output control chart above, in which period was the input/output rule broken?

单选题

WORK CENTER 210 (in standard hours)
Period    1     2     3     4     5  
PLANNED INPUT  150   150    150    150   150  
ACTUAL INPUT 150 145 130
Period     1     2     3     4     5  
PLANNED OUTPUT 180    180    180    180    150  
ACTUAL OUTPUT 185 140 160
Based on the input/output control chart above, what should the input be in Period 4 in order to reduce the backlog?

单选题

A major effort in JIT is reducing or eliminating the queues. The benefits of reducing the queues are:
I. Faster setup times
II. Reduced inventory investment
III. Shorter lead times

单选题

Setup time reduction in a JIT implementation is very important because:
I. Small lot sizes reduce inventory
II. Production output will increase
III. All of the products can be made constant

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码