An operator is monitoring a process through the use of a process control chart. After dozen of measurements have fallen well within the control limits, one measurement occurs very slightly outside of the UCL. The operator should probably respond by:

A
Immediately making adjustments to the process
B
Closely monitoring the process until the next measurement is taken
C
Changing the reading to make it appear that it fell within the control limits
D
Completely ignoring the reading

答案解析

正确答案:B
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

The proper sequence to follow when applying benchmarking processes is to

单选题

Expediting can be a positive response to business growth and

单选题

Reductions in which two of the following production variables form the best performance measure of a MRP?
I. Setup time
II. Number of action messages
III. Average queue
IV. Component shortages

单选题

If a MTS company shifts its manufacturing operations to MTO, the effect on annual setup costs and delivery lead time will be which of the following?

单选题

Effective execution control can improve customer service in which of the following ways?
I. By reducing lead time
II. By replenishing finished inventory on schedule
III. By improving component availability

单选题

When a company embarks on a path of major or breakthrough improvement for a specific task the best place to start is with

单选题

Which of the following documents provide opportunities to reduce paperwork with supplier partners?
I. Receiving documents
II. Purchase requisitions
III. Purchase orders
IV. Invoices

单选题

Which of the following problems can be identified and adjusted at the RCCP level?

单选题

A company produces and distributes three families of basic materials that are sold directly to manufacturers. The industry is very competitive and the growth rate is low. Which of the following would be the most appropriate focus for the operations strategy in this situation?

单选题

Within a push system, assemblies are released and pushed through production based on which of the following?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码