AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

Which of the following documents provide opportunities to reduce paperwork with supplier partners?
I. Receiving documents
II. Purchase requisitions
III. Purchase orders
IV. Invoices

A
I, II, III and IV
B
I and IV only
C
II and III only
D
I, II and III

答案解析

正确答案:A

解析:

All 4 of the purchasing documents listed constitute paperwork for the purchasing function. By automating or reducing the about of labor needed to generate each document, paperwork with supply partners can be reduced;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following would be considered waste in a JIT environment?
1. Inspection
2. Material movements
3. Acknowledgements
4. Invoices

单选题

A bar code data collection system can be used for:
1. Labor reporting for jobs;
2. Time and attendance tracking;
3. Move time calculations;

单选题

The most effective way to provide for improved coordination between supplier and customer is:

单选题

A common reason for resistance from marketing to implementation of JIT practices is

单选题

In defining product quality, the term reliability means:

单选题

Which of the following statement is true about pull systems for distribution inventory control?
1. They are useful when geographical demand patterns can be forecast accurately at the factory;
2. They are most appropriate with low-value, low-volume items;
3. They are important when goods are frequently on allocation from the factory;

单选题

An operator is monitoring a process through the use of a process control chart. After dozen of measurements have fallen well within the control limits, one measurement occurs very slightly outside of the UCL. The operator should probably respond by:

单选题

Which of the following determines whether product scheduling is required?

单选题

Which of the following systems would be most appropriate for managing an inventory of solenoids purchased by an appliance manufacturer for use in the assembly of several models of an automatic dishwasher?

单选题

Which of the following are the desired results of removing a Kanban card from between 2 steps of a smooth flowing process?
1. New suggestions from small group activities;
2. The insertion of a Kanban card to replace the one removed;
3. Interruptions in the process flow;

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码