The proper sequence to follow when applying benchmarking processes is to
答案解析
解析:
相关题目
An operator is monitoring a process through the use of a process control chart. After dozen of measurements have fallen well within the control limits, one measurement occurs very slightly outside of the UCL. The operator should probably respond by:
Which of the following determines whether product scheduling is required?
Which of the following systems would be most appropriate for managing an inventory of solenoids purchased by an appliance manufacturer for use in the assembly of several models of an automatic dishwasher?
Which of the following are the desired results of removing a Kanban card from between 2 steps of a smooth flowing process?
1. New suggestions from small group activities;
2. The insertion of a Kanban card to replace the one removed;
3. Interruptions in the process flow;
Which of the following statements are true regarding queues?
1. Queue size and lead time are interchangeable
2. Queue size and lead time are interconnected
3. Queue time is variable based on priority
If a work center is becoming a bottleneck and throughput time is getting longer, which of the following could be a solution?
1. Decrease the input
2. Increase the planned lead time
3. Increase the capacity
An effective technique in a JIT environment to increase management and staff involvement in the production process is:
Which of the following is associated with backward scheduling?
Which item is a role of the six sigma champion?