相关题目
Which two of the following actions within a change program will lead to improved organization performance?
I. Strengthening commitment through joint diagnosis of business problems;
II. Institutionalizing systems and procedures early in the change process;
III. Using measures that support continuous learning and change;
IV. Using a functional team management approach to reorganize operating units
In a culturally diverse problem-solving group with varying priorities, a common impediment to achieving the best solution is:
Which of the following typically are item master data elements?
I. Inventory transactions;
II. Lot-sizing rule;
III. Lead time;
IV. Component part numbers;
Which of the following methods is the most effective way to ensure quality?
When a significant increase in production volume is anticipated, the most appropriate response would be to
Focused factory operations include which of the following benefits?
I. Improved machine flexibility;
II. Improved quality;
III. Reduced inventory;
IV. Reduced material handling
Intrinsic forecasting techniques would be most appropriate for forecasting:
Which of the following factors are required for effective project control?
I. An automated project control system;
II. Procedures for performance measurement;
III. Stakeholder agreement the plan is realistic;
IV. Weekly progress reports to the executive steering committee;
Standard cost system may be inadequate in a competitive environment for which of the following reasons?
I. They provide little guidance for improving manufacturing processes;
II. They can sometimes drive a manager to make the wrong decision just to "look good";
III. Absorption accounting may lead to excess production;
IV. Cost standards often provide misleading information;
Which of the following capacity planning (load) report characteristics can be attributed to MRP?
I. load is based on both planned and open orders;
II. Load reflects valid order priorities;
III. Load distribution is based on actual lead times;