Which of the following factors are required for effective project control?
I. An automated project control system;
II. Procedures for performance measurement;
III. Stakeholder agreement the plan is realistic;
IV. Weekly progress reports to the executive steering committee;
答案解析
解析:
相关题目
Important and measurable characteristics of a product or process whose performance targets are set by customer is
When attempting to understand whether there is a relationship between 2 variables, which quality control tool should be used?
After come investigation, a packaging company determined that all of its defective containers were being delivered by one of their third-party trucking companies. What quality tool would have been used to find this information?
Structured problem solving providers what essential result to an organization?
A company has implemented a corrective action to one for the 4 production lines. Before implementing the change to the other lines, which of the following action should be taken?
A company has successfully completed improvement projects in several business units. Which of the following breakthroughs would be achieved when the improvements are embedded into the entire organization?
A manufacture is experiencing expensively long setup times and first-piece inspection. Which of the following areas should be examined first?
Which of the following approaches provides the reliability necessary to support a tightly integrated manufacturing operation?
When designing a cell, a company should consider which of the following factors when determing the qty needed for installation of a specific machine type?
Based on TOC scheduling approach, smaller lots created as a result of splitting order quantities are considered to be: