The design of a manufacturing process for high production volumes would likely facilitate which two of the following outcomes?
I. High frequency of new product introduction
II. Low level of WIP inventory
III. Low level of finished-goods inventory
IV. Low process flexibility except for options
答案解析
解析:
IV is incorrect because high process do not produce ATO products;
相关题目
Production activity control is essential to a closed-loop system because it:
Which of the following costing methods shows the greatest apparent profit in a time of inflation?
Which of the following performance metrics best measures customers satisfaction?
A supplier of roller bearing makes lots of 10000 and short them automatically according to size. In a typical lot of 1000, the sizes break into the categories: The product requires rollers on target or, at most, 0.0001 oversize. Experience indicated that 100% must be respected before use because the machine inspection lets a few defective units slip through. The supplier should be encouraged to take which of the following actions?
A work center has a balance between the scheduled input and output over the next 4 weeks. One of the 3 machines in the work center will be out of service for 1 week. Currently, 3 operators work the 1st shift, 1 operator works the 2nd shift, and each has a 40-hour work week. Which of the following actions is best to take to maintain the schedule?
Which of the following persons has direct responsibility for the accuracy of production activity reporting
To successfully implement a multiple-site pickup of parts from different supplier, it is necessary that:
A customer has complained that paint is peeling off a product recently purchased from a supplier. A team is formed in the supplier plant to solve the: Which of the following method bent describes the problem-solving approach used by the team?
Small-group improvement activities are most effective when the:
An effective implementation of the S&OP processes would typically result in the firm's ability to: