Which of the following performance metrics best measures customers satisfaction?

A
Order released on schedule
B
Orders changed after release
C
Order shipped on first-promised date
D
Orders received on customer-requested date

答案解析

正确答案:D
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following statements best characterizes the relationship between sales and operations planning and lean production?

单选题

A standard cost accounting system often is tied directly to the routing and dispatching systems, as well as product structure. Which of the following cost measures are determined from this data?
I. Overhead costs
II. Job cost
III. Standard variances

单选题

The design of a manufacturing process for high production volumes would likely facilitate which two of the following outcomes?
I. High frequency of new product introduction
II. Low level of WIP inventory
III. Low level of finished-goods inventory
IV. Low process flexibility except for options

单选题

Which of the following outcomes are objectives of a focused factory?
I. Worker specialization
II. Simplified routings
III. Emphasis on end-product throughput

单选题

Which of the following statements about the BOM used in MRP is true?
I. It lists components of each assembly;
II. It plays a role in computing requirement;
III. It should be structured to reflect how a product is built;
IV. It should exclude class C items;

单选题

A company has started a total quality management program, WIP inventory most likely will:

单选题

A number of companies have created electronic scorecards to gather statistics on a variety of topics such as inventory, sales, costs and forecasts. This varying information is often referred to as the:

单选题

Which of the following order-fulfillment strategies has the key demand management take of coordinating information on customer's product needs with engineering?

单选题

A machine supplier realizes that a machine malfunction at a customer's facility would result in expensive downtime and repair, the supplier decides to gather information about and stock repair part that might be needed. This action best represents the concept of:

单选题

Which of the following inventory would be the customer order penetration point in a MTO environment?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码