A company has implemented a corrective action to one for the 4 production lines. Before implementing the change to the other lines, which of the following action should be taken?

A
Check the effectiveness of the change
B
Evaluate the define-measure-analyze-improve-control results
C
Start an A3 process
D
Train employee on other lines

答案解析

正确答案:A
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following methods is the most effective way to ensure quality?

单选题

When a significant increase in production volume is anticipated, the most appropriate response would be to

单选题

Focused factory operations include which of the following benefits?
I. Improved machine flexibility;
II. Improved quality;
III. Reduced inventory;
IV. Reduced material handling

单选题

Intrinsic forecasting techniques would be most appropriate for forecasting:

单选题

Which of the following factors are required for effective project control?
I. An automated project control system;
II. Procedures for performance measurement;
III. Stakeholder agreement the plan is realistic;
IV. Weekly progress reports to the executive steering committee;

单选题

Standard cost system may be inadequate in a competitive environment for which of the following reasons?
I. They provide little guidance for improving manufacturing processes;
II. They can sometimes drive a manager to make the wrong decision just to "look good";
III. Absorption accounting may lead to excess production;
IV. Cost standards often provide misleading information;

单选题

Which of the following capacity planning (load) report characteristics can be attributed to MRP?
I. load is based on both planned and open orders;
II. Load reflects valid order priorities;
III. Load distribution is based on actual lead times;

单选题

Good measures of material planning performance include evaluations of which of the following factors?
I. Percent of order due dates met
II. Percent of assembly orders with no shortage
III. Actual work center output/scheduled work center capacity
IV. Percent of orders started on time

单选题

Which of the following sequences of steps is preferred to help identify the root cause of a production problem?
1. Identify specific potential causes;
2. Prioritize the causes;
3. Describe the problem;
4. Establish cause categories;

单选题

When evaluating potential customer/supplier partnerships, the supplier should consider which of the following questions?
I. Is the customer creditworthy?
II. Does the customer practice lean/TQM?
III. Will the customer share cost savings?
IV. Is the customer active in preventive maintenance?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码