AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

Setup time reduction in a JIT implementation is very important because:
I. Small lot sizes reduce inventory
II. Production output will increase
III. All of the products can be made constant

A
I and II
B
I and III
C
II and III
D
I, II, and III

答案解析

正确答案:D

解析:

Setup time reduction provides a great opportunity to improve operations. Excess setup times use productive capacity on the machine which could be used for manufacturing parts, rather than being down for setup. Reducing setup time also allows small lots to be produced. The effect of these small lots is to produce only the amount of product that is demanded by customers. This reduces the amount of inventory being held.
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码