Which of the following techniques would provide the most comprehensive evaluation when designing a new product?

A
Benchmarking
B
QFD
C
Prototyping
D
Consumer surveys

答案解析

正确答案:B
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

In a make-order environment, it is important to control the customers order after it has been entered into the system. Frequently, the order is taken and a great deal of engineering must occur before the final product is shipped to the customer. As a result, certain product features are known at order entry time, while others must be engineered. To help reduce engineering lead times, which of the following techniques can be used?

单选题

Which of the following would best describe where customer service levels and safety stocks are defined?

单选题

All of the following are priority sequencing rules except:

单选题

Which of the following statements are true regarding time-phased order point?
I. Lot sizing is eliminated
II. It is more effective than re-order point
III. Uses MRP logic for independent demand

单选题

In a make to order company, which of the following would be included in the delivery cycle time?
I. Time to process the customer's order.
II. Time to manufacture the product.
III. Time to deliver the product from the warehouse to the customer.

单选题

A company is producing products in a repetitive manufacturing line at the rate of 1800 units per day with 10 people. The company has chosen to backflush materials and labor at the standard. How will the company know if the labor is being used efficiently?

单选题

Which of the following is used to provide an understanding of the potential economic alternatives available to a decision maker?

单选题

All of the following are a basic component of a simulation EXCEPT:

单选题

Two criteria are useful in determining which costs are relevant to a particular inventory management decision. One criterion is: Does the cost represent an actual out of pocket expenditure? The second criteria is:

单选题

The manufacturing operation has just picked an unplanned issue for the current operation. The unplanned issue has occurred due to scrap, which was unexpected. The cost of the unplanned issue, in a standard cost system, will be charged to:

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码