In a make-order environment, it is important to control the customers order after it has been entered into the system. Frequently, the order is taken and a great deal of engineering must occur before the final product is shipped to the customer. As a result, certain product features are known at order entry time, while others must be engineered. To help reduce engineering lead times, which of the following techniques can be used?

A
Resource bills of materials
B
Modular bills of materials
C
Pseudo bills of materials
D
Specialized planning bills of material

答案解析

正确答案:D

解析:

General parameters for design in a make-to-order product are usually known at the time of order entry. These known general parameters allow a specialized planning bill of materials to be created. The engineered product can be patterned after an existing product which has been made in the past. The intention is to establish a bill of materials for something close to the engineered product.
The known parts are set up in the bill of materials with the existing part numbers while the unknown parts can be entered with temporary part numbers. Initial planning must be done based on a combination of what's known and what's estimated. Subsequent modifications to the bill of materials are made as the engineering process occurs.
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码