An ETO environment with fairly long lead times has a severely overloaded work center in the middle of the production process. Assuming deadlines cannot be changed, a simulation of the situation is most likely to
答案解析
解析:
相关题目
In order to have a Kaizen event you must have
I. Small multi - disciplined team
II. Team trained in problem solving
III. Upper Management on the team
Which of the following is counted during periodic physical inventory?
I. Raw Material
II. Sub Assemblies
III. Finished Goods
IV. Material Received Not in Stock
What is a tool that links customer desires through product design to manufacturing performance and process variables?
Which of the following are lot sizing methods?
I. Fixed Order Quantity
II. Kanban Quantity
III. Agreed Order Quantity
IV. Time Period Ordering
What capacity is established by averaging the actual output produced in standard hours in previous periods?
A supplier who consistently meets predetermined quality, cost, delivery, financial, and quantity objectives will generally be awarded:
Sometimes, the more distant suppliers will absorb the additional freight charge to match the freight charge of the geographically closer supplier. This practice is known as:
In order for a supplier to supply in a JIT manner, meeting the schedule with the right products at the right time, which of the following is imperative?
The mission of the purchasing department is to identify and qualify adequate sources of competitively priced supply to manufacture the products required by the marketplace. Many times, this mission includes identifying sources regardless of their location. This is called:
In today's manufacturing environment of eliminating waste, many companies are eliminating the purchase order because it does not add value for the customer. This is accomplished usually by replacing individual PO's with: