In order for a supplier to supply in a JIT manner, meeting the schedule with the right products at the right time, which of the following is imperative?
答案解析
解析:
相关题目
Workloads between work centers might be redistributed by
A scheduling method for compressing lead time or to expedite a small quantity is
Infinite loading will indicate which of the following situations when comparing a gateway work center to a non-gateway non-bottleneck operation?
Which of the following elements of lead time is ignored by CRP?
In a job shop environment, which situation is optimal from a capacity planning perspective?
Theoretical capacity is most closely approached by
Which of the following actions would result in shorter purchasing lead times?
An ETO environment with fairly long lead times has a severely overloaded work center in the middle of the production process. Assuming deadlines cannot be changed, a simulation of the situation is most likely to
Infinite loading is useful for
Which of the following flows is most likely used in a flow environment that is supply-constrained by the availability of a seasonal vegetable?
