Which of the following actions may result in unmanageable backlog?
答案解析
解析:
相关题目
In the dish soap business, when making dish soap there is extra chemicals that are left over from creating the dish soap that can be sold to the auto industry. What are these extra chemicals that are left over
BEST be called?
The direct definition of the capability of a system to perform its expected function is called what?
All of the following would be typical applications of linear programming EXCEPT
In the logic of MRP. If we do not have enough on hand and we do not have sufficient on order, what should the planner do?
What are the cost elements of WIP Inventory?
I. Scrap
II. Material.
III. Labor
IV. Overhead
Basic data for a project schedule includes all of the following EXCEPT
What would be considered a cause for an unplanned event?
I. Machine breakdown
II. Special Orders
III. Rework Orders
IV. Extra Sales Orders
A Component Item is which of the following
I. A Dependent demand Item
II. A Raw Material
III. A sub assembly
What is needed in order to run an effective quick response program?
I. World class forecasting and planning.
II. High Inventory Accuracy
III. High Safety Stock
IV. EDI
All of the following are part of the MRP Grid EXCEPT