AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

A Component Item is which of the following
I. A Dependent demand Item
II. A Raw Material
III. A sub assembly

A
I, II, & III
B
I & III Only
C
I & II Only
D
II, & III Only

答案解析

正确答案:A

解析:

A component part is a raw material, ingredient, part, or sub-assembly that goes into a higher level assembly, compound, or other item.
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Period 1 2 3 4 5 6 7 8
Gross requirements 40 40 50 60 60 80 80 80
Scheduled receipts 100
Projected available 60
order quantity: fixed order quantity of 100
Safety stock: 20
Lead time: 2 weeks
Using the information provided, planned orders would be generated with release dates falling in which of the following periods?

单选题

Period 1 2 3 4 5 6 7 8
Gross requirements 36 42 50 45 55 55 55 55
Scheduled receipts
Projected available 80
order quantity: fixed order quantity of 100
Safety stock: 10
Lead time: 1 week
What are the PAB in period 4?

单选题

MRP indicates that SS will be dipped into period 2. The next orders will be received in period 3 due to a common availability issue at the supplier, which of the following actions will most likely occur?

单选题

A parent item has a net demand of 100 units in period 6. Its lead time is two periods. One of the components is used in quantities of 4 per unit, has 0 inventory and a lead time of a week. It is purchased in 1000 units order quantities, which of the following planned order receipts would be the result of the explosion process for the components?

单选题

The frequency that material requirements should be replanned is determined by

单选题

Period 1 2 3 4 5 6 7 8
Gross requirements 40 10 30 50 50 20 30 40
Scheduled receipts
Projected available 130
order quantity: 40
Safety stock: 10
Lead time: 3 periods
What are the planned order release for period 4 and 5?

单选题

An authorization to the purchasing to purchase specified materials in specified quantities within a specific time is

单选题

Which of the following actions may result in unmanageable backlog?

单选题

Which of the following actions is taken first to ensure the validity of the material plan in a MTS company?

单选题

Low-level codes are maintained by the BOM system because they

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码