The frequency that material requirements should be replanned is determined by
Period 1 2 3 4 5 6 7 8
Gross requirements 40 10 30 50 50 20 30 40
Scheduled receipts
Projected available 130
order quantity: 40
Safety stock: 10
Lead time: 3 periods
What are the planned order release for period 4 and 5?
An authorization to the purchasing to purchase specified materials in specified quantities within a specific time is
Which of the following actions may result in unmanageable backlog?
Which of the following actions is taken first to ensure the validity of the material plan in a MTS company?
Low-level codes are maintained by the BOM system because they
If an annual contract is in place, the supplier is notified of the delivery amount required by means of a
The validity of the material requirements plan is most reliant on the accuracy of
Which of the following statements correctly describes netting logic when safety stock is involved?
Which of the following packing slip errors most likely indicated that there are 2 errors?