The validity of the material requirements plan is most reliant on the accuracy of
答案解析
解析:
The other response are all outputs of either the MPS or MRP;
相关题目
What does Kaizen stand for in Japanese?
Which of the following is NOT a benefit of RFID technology?
Planned order receipt is created when a
Which of the following would be a part of supplier performance?
I. Accuracy of paperwork
II. Product Condition
III. Responsiveness
IV Quantity
In the dish soap business, when making dish soap there is extra chemicals that are left over from creating the dish soap that can be sold to the auto industry. What are these extra chemicals that are left over
BEST be called?
The direct definition of the capability of a system to perform its expected function is called what?
All of the following would be typical applications of linear programming EXCEPT
In the logic of MRP. If we do not have enough on hand and we do not have sufficient on order, what should the planner do?
What are the cost elements of WIP Inventory?
I. Scrap
II. Material.
III. Labor
IV. Overhead
Basic data for a project schedule includes all of the following EXCEPT