相关题目
Low-level codes are maintained by the BOM system because they
If an annual contract is in place, the supplier is notified of the delivery amount required by means of a
The validity of the material requirements plan is most reliant on the accuracy of
Which of the following statements correctly describes netting logic when safety stock is involved?
Which of the following packing slip errors most likely indicated that there are 2 errors?
Period 1 2 3 4 5 6 7 8
Gross requirements 40 10 30 50 50 20 30 40
Scheduled receipts
Projected available 130
order quantity: 40
Safety stock: 10
Lead time: 3 periods
What is the first period where a planned order receipt is the result of dipping into the safety stock?
A supplier has notified the buyer at an order for a component will be 2 weeks late due to a material shortage. Which of the following actions should the material planner take?
Which of the following outputs from MRP is of most use to the rest of the organization for achieving the material plan?
Using a planning horizon shorter than the longest cumulative lead time may result in
A firm planned order is used to
