The plan for the production and purchase of components used in making items in the MPS is the
答案解析
解析:
相关题目
When a non-bottleneck stops, what supply's the bottleneck work center?
Which of the following are basic methods of managing a contract?
1. Vendor scheduling
2. Direct shipment
3. Release system
Which of the following are lead time elements:
1. Set-up time
2. Buffer time
3. Run time
4. Drum time
All of the following are batching rules EXCEPT
At a restaurant, fresh vegetables would have the MOST cost associated to it?
Which of the following would NOT be a type of MRO Inventory?
Using the following table, calculate the Mean Absolute Deviation (MAD)
Period Forecast Actual
1 100 90
2 100 90
3 120 110
4 120 120
5 150 180
6 200 200
7 250 300
8 200 250
9 180 200
10 150 120
12 100 90
Total: 1790 1850
What demand fluctuates around an average demand?
What type of scheduling is the typical method used for MRP logic?
What does Kaizen stand for in Japanese?
