Which of the following elements is used to reduce system nervousness?
答案解析
解析:
相关题目
All of the following are inputs to MRP EXCEPT
When looking at a Bill of Materials. Under APICS rules, assembly part numbers are shown as what?
What manufacturing process flow uses rate based scheduling?
What equals the ratio of actual units produced to the standard rate of production expected?
Which of the following is NOT held on a route sheet?
What type of inventory would a table that has been fully assembled, but not painted to the specifications of the customer be?
What type of engineer is their function to produce a product at the right quality economically and consistently?
The difference between a where used report and a pegging report is that a pegging report
The priority of one part being determined by the availability of another at the same level is called what?
Justin's company is trying to determine how much they should order of their top selling item. They are using the order point system and they currently have 1223 stock on hand
Average weekly demand = 100 Products
Lead Time = 10 Weeks
Safety Stock is 200
Economic Order Quantity = 600
How much should they order using the order point system?