A purchased component has a net requirements in period 4. It has a 6-period lead time and no schedule receipts. Which of the following actions would be the result of MRP?
Which of the follow statements is true about the MRP process?
A company produces a variety of items with short manufacturing lead times. Which of the following capacity planning techniques would be most useful for bottle neck work center?
Consolidated information stored in a single record that contain everything needed to know about a part to plan it effectively is referred to as
Increasing planned lead times will result in which of the following outcomes?
Input
Period 1 2 3 4 5 6
Plan 400 400 450 450 500 500
Actual 450 430 440 480 520 530
Output
Period 1 2 3 4 5 6
Plan 400 400 450 450 500 500
Actual 360 410 530 460 520 540
Using the information provided, what was the WIP at the end of period 4 if it was 35 prior to period 1?
Which of the following elements is used to reduce system nervousness?
Which of the following is typically a significant benefit of using bar coded labels to identify parts and storage locations?
If SS is 1000, unit cost is $2.00, lead time is 12 weeks, service level is 90% and demand is 3000 per week, what is the reorder point?
The inventory for a dependent demand item was incorrect during the last cycle count, and there is no safety stock, which data is from MPR is most use to the material planner to ensure availability of the part?