AI智能推荐题库-试题通 AI智能整理导入题库-试题通
×
首页 题库中心 CPIM PART2-供应链资格认证考试 题目详情
C93BF00FBEF00001B89720C0D4CE1712
CPIM PART2-供应链资格认证考试
3,028
单选题

A Canadian-based company has a long-term contract with a US-based supplier. The Canadian company has been experiencing short shipments and variations of the supply lead time with the US supplier for a few months. Which of the following is the most
appropriate action for the master production scheduler in this situation?

A
Ask the purchasing manager to work with the supplier to improve their shipping
quantity accuracy and lead time stability
B
Ask the purchasing manager to terminate the contract with this supplier, and look
for a better supplier
C
Apply safety stock and safety lead time while planning the master production
schedule.
D
Apply safety lead time according to the target service level while planning the
master production schedule.

答案解析

正确答案:D
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A company produces 10 families of products that require 6 weeks cumulative lead time to produce and are stocked for sale from the distribution center. Which of the following reviews is of little or no value in the sales and operations planning process?

单选题

The table provided is an example of which of the following production strategies?
Open inventory=10
Period 1 2 3 4
Inventory 10 10 10 10
Planned production 20 25 30 35
Sales 20 25 30 35

单选题

When assessing a manufacturer's risk and likely points of weakness, a key area that must be analyzed is

单选题

Which of the following characteristics of a new product being introduced will most affect choice of a product family for sales and operations planning?

单选题

In a MTS environment, which of the following is the best reason for developing a manpower plan as part of the sales and operations planning process?

单选题

In a company that has over 20,000 end items in stock, which of the following demand elements is likely to take the most time to assess for sales and operations planning?

单选题

A company intends to cut its backlog from 4 months to 2 months. Annual demand is 360 units. The number of units that should be included in the production plan is

单选题

Planning horizon: 18 months
Working days per planning period: 22
Production planning approach: Level
Total demand: 72000units
Beginning inventory: 4800units
Target for ending inventory: 6600
Planned lot size: 2000
The production per planning period required to satisfy this plan in units is closest to

单选题

Which of the following results is most likely to occur in a company that does not use a formal sales and operations planning process?

单选题

Load smoothing at the production planning level to resolve an overload condition identified by resource planning is an example of

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码