At times, data used to forecast will be of poor quality. Which of the following would be the correct action for the stated data quality problem?
I. Filter and adjust for abnormal demand
II. Accept data omissions and plan around them
III. Accept normal variations in the data
IV. Substitute for data omissions
答案解析
解析:
相关题目
In a standard cost environment, which of the following labor reporting is most important to a continuous improvement program?
Pull systems have which of the following advantages over push systems?
A significant difference between absorptions and variable costing is that the variable costing
Which of the following statements is true about concerning throughput?
An assembly line consists of a combination of paced automated and manual operations. An element that interferes with achieving an average time is
In Which of the following type of environments is capacity control likely to be of more importance than material control?
Which of the following benefits of setup reduction is most immediate?
A correct statement about the use of a bottleneck is
1 method for increasing throughput is
A piece of equipment is incapable of maintaining process control for longer than 4 hours and has become a bottleneck, due to unforeseen tooling wear. Tool sharpening requires 2 hours to sharpen and move back into production. Which of the following correctives actions should be done first?