Stockouts have occurred to failures by suppliers to ship on schedule, causing extensive backorders. The past due orders were successfully reduced due to overtime once the parts arrived. The best approach for incorporating this information into the sales and operations planning process for the upcoming month is to

A
Increase the demonstrated capacity in the first period to reflect the use of overtime
B
Maintain the existing approach for developing the production and operational plans
C
Reduce the forecast demand in the first period and replace it the remaining past due orders
D
Reduce the production plan in the first period to free up capacity for the past due orders

答案解析

正确答案:B

解析:

The plan is still valid as the problem existed due to a supplier issue; The production plan should not be reduced due to supplier problem;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码