The most likely reason for waiving inspection on a phased receipt is

A
The part passed inspection six times in a row
B
The lot qty is too small to select a random sample from
C
The receipt is a replacement for one previously rejected
D
The material is holding up production at the bottleneck

答案解析

正确答案:A

解析:

Part of acceptance sampling is to determine when the need for sampling can be reduced or eliminated;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Stockouts have occurred to failures by suppliers to ship on schedule, causing extensive backorders. The past due orders were successfully reduced due to overtime once the parts arrived. The best approach for incorporating this information into the sales and operations planning process for the upcoming month is to

单选题

One reason for evaluating multiple sales and operations plans during the pre-S&OP meeting is

单选题

Which of the following production strategies should show the most consistently high capacity performance?

单选题

Which of the following actions will a company most likely take as a primary focus of their level production strategy to deal with demand peaks while meeting standard lead time delivery?

单选题

A company uses a level production strategy to build inventory prior to a peak season, which of the following inventory turns should be expected?

单选题

A company produces 10 families of products that require 6 weeks cumulative lead time to produce and are stocked for sale from the distribution center. Which of the following reviews is of little or no value in the sales and operations planning process?

单选题

Which of the following characteristics of a new product being introduced will most affect choice of a product family for sales and operations planning?

单选题

In a MTS environment, which of the following is the best reason for developing a manpower plan as part of the sales and operations planning process?

单选题

In a company that has over 20,000 end items in stock, which of the following demand elements is likely to take the most time to assess for sales and operations planning?

单选题

Which of the following results is most likely to occur in a company that does not use a formal sales and operations planning process?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码