Of the 5 popular and commonly used capital budget techniques, 4 common methods are:

A
Payback period, internal rate of return, external rate of return and net present value
B
Payback period, accounting rate of return, NPV and IRR
C
Profitability index, IRR, External rate of return and NPV
D
Independent investment analysis, IRR, ERR, NPV

答案解析

正确答案:B
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A company is going to evaluate the quality performance of several suppliers over a 120 day period and the initial measure will be the acceptance rate of each incoming lot. Which of the following would be the most appropriate to use to track the performance of each supplier?

单选题

The portion of setup that is charged to the order includes

单选题

Greater input than output at a work center on an occasional basis is most likely caused by

单选题

An process that was in control using control charts now has a mean that is trending to be out of control, the most likely reason is

单选题

Units per period: 10,000
Direct labor at actual: $160,000
Direct material as standard: $600,000
Overhead: $400,000
Margin per unit: $50
Scrap unit per period: 100
Using the information provided on the most recent period, the product cost based on process costing is

单选题

Work center 10 has 44 hours of available capacity, product X has an internal setup time of 2 hours, and a run time of 4 hours per piece. What quantity of product X can be produced?

单选题

In its haste to roll out new products, marketing often sells product too early and promises delivery dates that are unworkable. A good way to prevent this type of failures is to

单选题

Point-of-use storage has which of the following advantages as compared to warehousing?

单选题

An electronic board that provides visibility of floor status and supplies information to help coordinate the efforts to linked work centers is

单选题

A gear manufacturer has departments running 3 shifts/day, 5 days a week except for the heat-treating furnace which must run 24 hours/day, 7 days a week;
Shifts for all departments, except the heat-treating furnace, are 8 hours with 1 hour of lunch/break time per day.
The heat-treating furnace produces 50 units/hour, operating 24 hours/day, 7 days/week, with no down time;
The gear machining process produces 85 units an hour, operating at 3 shifts/day, 5 days/week.
The final assembly line currently is a bottleneck and is capable of producing at a rate of 120 units per hour, and operates 1 shift/day, 5 days/week.
Demand is for 8000 end items per week, what actions should the company make that will allow the 8000 end items to be made?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码