A company is going to evaluate the quality performance of several suppliers over a 120 day period and the initial measure will be the acceptance rate of each incoming lot. Which of the following would be the most appropriate to use to track the performance of each supplier?

A
Histograms
B
Control chart
C
Scatter diagram
D
Flow chart

答案解析

正确答案:B

解析:

Control chart is a graphic comparison of process performance data used to detect assignable causes of variation in the process. By using the control chart, the company can evaluate the average acceptance rates, any trends, and if the acceptance rates vary or remain stable for each supplier. Scatter diagrams are used to analyze the relationship between two variables;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码