Which of the following considerations is most important when selecting forecasting software?

A
Computational speed
B
Cost of data storage
C
Ability to forecast over multiple planning horizons
D
Ability to forecast capacity requirements

答案解析

正确答案:C
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A manufacturer's decision to extend the degree of forward integration should be influenced by its desire to do which of the following?
I. Reduce the uncertainty of demand;
II. Erect barriers to potential competitors;
III. Reduce the number of processes to be controlled;

单选题

Which of the following tools is considered an important quality management tool?

单选题

All of the following activities focus on promoting supply chain efficiencies except

单选题

Development of an effective work team involved which of the following guideline?

单选题

Which of the following elements is not part of a quality of the source effort?

单选题

A plant refines a raw material into a bulk liquid chemical using a highly automated production process, which of the following would be the most appropriate operational unit of measure of capacity and load in this situation?

单选题

Which of the following network planning techniques analyze a project's completion time for planning and control tool?

单选题

A company would choose MTS instead of MTO for specific products because:

单选题

A company's high-volume products are produced on an automated manufacturing line, and its low-volume products are produced using a labor intensive method. The use of a cost accounting system in which overhead are allocated to product cost as a percentage of direct labor hours will have which of the following results?
I. High-volume products are undercosted;
II. Low-volume products are undercosted;
III. Cost reduction efforts are biased in favor of labor cost reductions;
IV. Cost reduction efforts are biased in favor of material cost reductions;

单选题

A company uses centralized planning at the manufacturing site for DRP decisions. How is the reorder point typically established for this type of centralized planning?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码