A company uses centralized planning at the manufacturing site for DRP decisions. How is the reorder point typically established for this type of centralized planning?

A
When the PAB for a future given period is negative or below the safety stock level
B
By a pre-determined standard order point
C
When the minimum level is reached in mix/max planning
D
There is no reorder point, finished goods are allocated evenly through the DRP as they are completed by manufacturing;

答案解析

正确答案:A

解析:

Decisions about when to replenish distribution inventory made by centralized supply planners is an indication that the company is using a pull system for distribution inventory;
In a pull system for distribution inventory, the reorder point will typically be when the PAB for a future period is negative or below safety stock levels;
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码