Which of the following network planning techniques analyze a project's completion time for planning and control tool?

A
Critical point backflush
B
Critical path method
C
Path Convergence
D
Milestone development

答案解析

正确答案:B

解析:

A critical point backflush is defined as backflush performed at a specific point in the manufacturing process, at a critical operation, or at an operation where key components are consumed as specified in the production order BOM;
Path convergence is defined as the point in a network diagram where one or more parallel paths come together. A delay on any of the parallel paths can conceivably delay network completion. Path convergence is used in project management;
路径会聚:进度计划中的节点,平行的路径在此节点处合并或汇合。在该节点上,延误、延长或任何会聚的路径都会导致项目延误。在进度的风险定量分析中,重大风险可能会在该节点发生。
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码