The RESET test switch is used to erase the fault history. Push the RESET switch while the VERIFY and the green GO lights are on.
答案解析
相关知识点:
RESET电门消故障记录
相关题目
This section must set forth each mandatory replacement time, structural inspection interval, and related structural inspection procedure required for type certification.
The rules contained in this specification shall serve as guides for format, style and method of presentation for all material included in Maintenance Manuals prepared by manufacturers.
Weights corresponding to the airplane as offered with typical seating and interior, avionics, accessories, standard equipment and fixed ballast, and the typical empty weight and maximum useful load based on this weight.
Those instructions necessary to support the aircraft during maintenance and repair, includes information on shoring materials and equipment, contour dimensions, shoring locations, etc.
Direction as to who and how to contact technical personnel at the manufacturers Plant, for assistance in repairing or replacing items damaged and not covered by a standard repair.
The airplane general arrangement shall be illustrated with a scale line drawing consisting of plan, side and front views presented in a vertical sequence upon a single page.
If the airplane experiences repeated failures of a pump at one location, there may be debris in the case drain line, case drain hose or case drain hose quick-disconnect that cannot be flushed by accomplishing this procedure.
If there is no hydraulic power to extend the nose gear, the weight of the gear and the airstream pushes the nose gear into the extended position.
Move the seat forward or aft approximately 0.50 in. (12.70 mm) to align the flanges on the seat track fittings with the holes in the seat tracks.
Overhaul of propellers must be accomplished in a qualified shop in accordance with data supplied by the propeller manufacturer.
