相关题目
Clean the surface to make sure that the bond is satisfactory.
Make sure that you remove all tools, equipment and loose objects from the air intake.
Make sure that all the lights on the front of the CMU do not come on.
Assure the avionics ventilation system continues to operate correctly.
Make sure that the intensity of the reticle light decreases gradually to zero.
Make sure that the rate of supply of fuel from the wing tanks to the center tank is equal.
Make sure that the shelf life is not expired.
Make sure that there are no incorrect indications on the instruments.
Make sure that you have a satisfactory view of all components.
Manufacturer's maintenance data shall include the information as to special tools, application of protective treatments after inspection, Structural fasteners,etc.
