611.Preparation of Technical Data for certain chapters in the Maintenance
Manual require joint contribution and close coordination between the
manufacturer of the airframe and the manufacturers of various other
components.
之间的共同贡献和密切协作。
商之间的共同协作。
技术参数的编写工作。
答案解析
相关题目
161.IF THE LOW PRESSURE CONDITION ( ) , REPLACE THE UNIT.
160.所有的修改都要得到设计部门的批准。
159.The same symbol, device, or code shall be used throughout the Handbook
to depict the same system, valve or control.
158.最大允许误差 5 毫米。
157.确保发动机进气道无外来物。
156.泵安装在液压马达后面。
155.CAREFULLY LIFT THE MAGNETIC LEVEL INDICATOR UNTIL YOU ( ) THE MAGNETS.
154.Optional information including ( ) the rationale
utilized to select CAPs - how the CAP requirements were determined.
153.The data, power, or energy put into equipment or a system.
152.Number the pages of multi-section CAPs with section number and a dash
(i.e., "1-" for all pages in the "Physical Requirements" section)
followed by the serial number of the page beginning with "1" for each
section (e.g-.Page 1-1, 1-2. etc.)
