113. Which task is at the lowest level of the WBS?

A、 variance

B、 objective

C、 deliverable

D、 work package

答案:D

试题通
项目管理期末复习WJH
试题通
96. Which is true about the agile method?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-1e20-c0f9-29e3bb5dbe00.html
点击查看题目
114. Which document should list and describe all of the deliverables required for the project?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-4148-c0f9-29e3bb5dbe00.html
点击查看题目
50. Which characteristic of organizational culture refers to the degree to which employees identify
with the organization as a whole, rather than with their types of job or profession?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-c060-c0f9-29e3bb5dbe00.html
点击查看题目
34. What is a difference between low-end and midrange tools of the project management software?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-9d38-c0f9-29e3bb5dbe00.html
点击查看题目
72. Which processes include acquiring and developing the project team, performing quality
assurance, distributing information, managing stakeholder expectations, and conducting
procurements?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-ef40-c0f9-29e3bb5dbe00.html
点击查看题目
61. Which approach to product development is currently used by many organizations so a predictive set of steps is used as an overall means to coordinate more detailed steps that are adaptively managed?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-d7d0-c0f9-29e3bb5dbe01.html
点击查看题目
161. Which is a similarity between the crashing and fast tracking?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-9b20-c0f9-29e3bb5dbe01.html
点击查看题目
5. Steve, an engineer in a construction company, is at present working on a home construction
project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is .
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-62a0-c0f9-29e3bb5dbe01.html
点击查看题目
157. What term is used for the amount of time an activity can be delayed from its early start without delaying the planned project finish date?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-9738-c0f9-29e3bb5dbe00.html
点击查看题目
187. According to Thamhain and Wilemon, what is the ability to improve a worker’s position?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-cde8-c0f9-29e3bb5dbe01.html
点击查看题目
首页
>
IT互联网
>
项目管理期末复习WJH
题目内容
(
单选题
)
手机预览
试题通
项目管理期末复习WJH

113. Which task is at the lowest level of the WBS?

A、 variance

B、 objective

C、 deliverable

D、 work package

答案:D

试题通
分享
试题通
试题通
项目管理期末复习WJH
相关题目
96. Which is true about the agile method?

A.  It is often used when a project team can express the scope early in the product life cycle.

B.  It is used when a project team wants to provide a potentially shippable product earlier
rather than later.

C.  It uses several iterations or deliveries of software instead of waiting until the end of the
project to provide a product.

D.  It is used when project teams want to use the predicative approach to a project.

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-1e20-c0f9-29e3bb5dbe00.html
点击查看答案
114. Which document should list and describe all of the deliverables required for the project?

A.  project charter

B.  scope statement

C.  WBS

D.  Gantt chart

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-4148-c0f9-29e3bb5dbe00.html
点击查看答案
50. Which characteristic of organizational culture refers to the degree to which employees identify
with the organization as a whole, rather than with their types of job or profession?

A.  Member identity

B.  People focus

C.  Group emphasis

D.  Unit integration

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-c060-c0f9-29e3bb5dbe00.html
点击查看答案
34. What is a difference between low-end and midrange tools of the project management software?

A.  Low-end tools are designed to handle primarily multiple users whereas midrange tools
are created to handle single users.

B.  Low-end tools provide robust capabilities to handle dispersed workgroups whereas
midrange tools do not.

C.  Midrange tools provide basic project management features whereas low-end tools offer
enterprise and portfolio management functions.

D.  Midrange tools are designed to handle larger projects than low-end tools.

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-9d38-c0f9-29e3bb5dbe00.html
点击查看答案
72. Which processes include acquiring and developing the project team, performing quality
assurance, distributing information, managing stakeholder expectations, and conducting
procurements?

A.  monitoring and controlling

B.  executing

C.  planning

D.  initiating

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-ef40-c0f9-29e3bb5dbe00.html
点击查看答案
61. Which approach to product development is currently used by many organizations so a predictive set of steps is used as an overall means to coordinate more detailed steps that are adaptively managed?

A.  Adaptive

B.  Hybrid

C.  Predictive

D.  Incremental

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-d7d0-c0f9-29e3bb5dbe01.html
点击查看答案
161. Which is a similarity between the crashing and fast tracking?

A.  both spread out tasks over a long period of time to ensure the quality of work is maintained

B.  both invariably result in increases in total project costs

C.  both can shorten the time needed to finish a project

D.  both are network diagramming techniques used primarily to predict total project duration

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-9b20-c0f9-29e3bb5dbe01.html
点击查看答案
5. Steve, an engineer in a construction company, is at present working on a home construction
project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is .

A.  Steve

B.  the support staff

C.  the project team

D.  the Robinson family

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-62a0-c0f9-29e3bb5dbe01.html
点击查看答案
157. What term is used for the amount of time an activity can be delayed from its early start without delaying the planned project finish date?

A.  total slack

B.  free float

C.  Backward pass

D.  forward pass

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-9738-c0f9-29e3bb5dbe00.html
点击查看答案
187. According to Thamhain and Wilemon, what is the ability to improve a worker’s position?

A.  penalty

B.  assignment

C.  expertise

D.  promotion