APP下载
首页
>
IT互联网
>
项目管理期末复习WJH
搜索
项目管理期末复习WJH
题目内容
(
单选题
)
63. In which systems development life cycle do model developers use a model to generate functional requirements and physical design specifications simultaneously?

A、 RAD life cycle

B、 Prototyping life cycle

C、 Spiral life cycle

D、 Waterfall life cycle

答案:B

项目管理期末复习WJH
119. During which approach do team members first identify as many specific tasks related to the
project as possible and then aggregate the specific tasks and organize them into summary activities, or higher levels in the WBS?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-4918-c0f9-29e3bb5dbe01.html
点击查看题目
186. According to Thamhain and Wilemon, what is the legitimate hierarchical right to issue orders?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-cde8-c0f9-29e3bb5dbe00.html
点击查看题目
139. In project schedule management, the main goal of which process is to ensure that the project
team has complete understanding of all the work they must do as part of the project scope so they
can start scheduling the work?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-7028-c0f9-29e3bb5dbe01.html
点击查看题目
5. Steve, an engineer in a construction company, is at present working on a home construction
project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is .
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-62a0-c0f9-29e3bb5dbe01.html
点击查看题目
65. Which of the following best describes a kill point in the project life cycle?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-dfa0-c0f9-29e3bb5dbe01.html
点击查看题目
105. Which action involves reviewing the project charter, requirements documents, and
organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-2dc0-c0f9-29e3bb5dbe01.html
点击查看题目
153. Which provide a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-8f68-c0f9-29e3bb5dbe00.html
点击查看题目
7. Which project management knowledge area ensures that the project will satisfy the stated or
implied needs for which it was undertaken?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-6a70-c0f9-29e3bb5dbe00.html
点击查看题目
197. Which term refers to the amount of individual resources an existing schedule requires during
specific time periods?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-e170-c0f9-29e3bb5dbe00.html
点击查看题目
179. What do people who seek to excel and tend to avoid both low-risk and high-risk situations to
improve their chances for achieving something worthwhile have a high need for?
https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-be48-c0f9-29e3bb5dbe01.html
点击查看题目
首页
>
IT互联网
>
项目管理期末复习WJH
题目内容
(
单选题
)
手机预览
项目管理期末复习WJH

63. In which systems development life cycle do model developers use a model to generate functional requirements and physical design specifications simultaneously?

A、 RAD life cycle

B、 Prototyping life cycle

C、 Spiral life cycle

D、 Waterfall life cycle

答案:B

分享
项目管理期末复习WJH
相关题目
119. During which approach do team members first identify as many specific tasks related to the
project as possible and then aggregate the specific tasks and organize them into summary activities, or higher levels in the WBS?

A.  analogy

B.  bottom-up

C.  top-down

D.  mind mapping

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-4918-c0f9-29e3bb5dbe01.html
点击查看答案
186. According to Thamhain and Wilemon, what is the legitimate hierarchical right to issue orders?

A.  authority

B.  achievement

C.  expertise

D.  self-actualization

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-cde8-c0f9-29e3bb5dbe00.html
点击查看答案
139. In project schedule management, the main goal of which process is to ensure that the project
team has complete understanding of all the work they must do as part of the project scope so they
can start scheduling the work?

A.  defining activities

B.  estimating activity durations

C.  estimating activity resources

D.  controlling the schedule

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-7028-c0f9-29e3bb5dbe01.html
点击查看答案
5. Steve, an engineer in a construction company, is at present working on a home construction
project. The home is being built for the Robinson family, the owners of the home. Steve is working with his project team and support staff to ensure the project is completed on time. In such a scenario, the project sponsor is .

A.  Steve

B.  the support staff

C.  the project team

D.  the Robinson family

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-62a0-c0f9-29e3bb5dbe01.html
点击查看答案
65. Which of the following best describes a kill point in the project life cycle?

A.  The period of time given to managers during the feasibility phases to decide on the cost,
quality, and time constraints for the project

B.  A review of the status of a project at each phase of development to determine if it should
be continued, redirected, or terminated

C.  The point of time in the project lifecycle after which it is impossible to terminate a running
project

D.  The final submission of the project deliverables after which the project is terminated

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-dfa0-c0f9-29e3bb5dbe01.html
点击查看答案
105. Which action involves reviewing the project charter, requirements documents, and
organizational process assets to create a scope statement, adding more information as requirements are developed and change requests are approved?

A.  Creating scope

B.  Defining scope

C.  Controlling scope

D.  Validating scope

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-2dc0-c0f9-29e3bb5dbe01.html
点击查看答案
153. Which provide a standard format for displaying project schedule information by listing project activities and their corresponding start and finish dates in a calendar format?

A.  Gantt charts

B.  Critical path analysis

C.  Arrow diagramming method

D.  PERT analysis

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-8f68-c0f9-29e3bb5dbe00.html
点击查看答案
7. Which project management knowledge area ensures that the project will satisfy the stated or
implied needs for which it was undertaken?

A.  Project cost management

B.  Project time management

C.  Project risk management

D.  Project quality management

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f5-6a70-c0f9-29e3bb5dbe00.html
点击查看答案
197. Which term refers to the amount of individual resources an existing schedule requires during
specific time periods?

A.  resource loading

B.  resource leveling

C.  resource histogram

D.  resource logs

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-e170-c0f9-29e3bb5dbe00.html
点击查看答案
179. What do people who seek to excel and tend to avoid both low-risk and high-risk situations to
improve their chances for achieving something worthwhile have a high need for?

A.  affiliation

B.  security

C.  power

D.  achievement

https://www.shititong.cn/cha-kan/shiti/0005ee7e-62f6-be48-c0f9-29e3bb5dbe01.html
点击查看答案
试题通小程序
试题通app下载