A、The maintenance staff is responsible for reviewing the overall progress of the work accomplished
B、All critical tasks should be assessed for arranging proper maintenance staff
C、The ETOPS item should be stamped to ensure the more accurate perfomance
答案:A
A、The maintenance staff is responsible for reviewing the overall progress of the work accomplished
B、All critical tasks should be assessed for arranging proper maintenance staff
C、The ETOPS item should be stamped to ensure the more accurate perfomance
答案:A
A. 重复使用ii型、iii型、iv型防冻液,后续没有使用i型除防冰液或热水的
B. 在喷洒除防冰液时,除防冰液水流柱与飞机垂直
C. 除冰液可以通过批准的清洁剂和软布或i型液冲洗去除
A. 值班主任
B. 维修人员
C. 放行人员
D. 任意人员
A. 保持时间
B. 保护时间
C. 除冰时间
A. Use lockwire no more than two times
B. The length of wire between the attachment points must be as short as possible
C. Wirelocking of installed flexible components or assemblies must have an effect on the quality of the installation or the locking during
D. BLANK
A. 没有规定标准间隔,应按照MEL中的放行条件维修此类项目
B. 3个连续日历日
C. 3个连续飞行日
D. 3天
A. 所属单位
B. 机场管理机构FOD管理办公室
C. 机场保洁部门
D. 110
A. SAFE PINS
B. SAFETY PINS
C. SEFETY CLIPS
D. SAFE CLIPS
A. 1
B. 2
C. 3
D. 4
A. 安全政策,风险源控制,安全监督,安全文化
B. 安全政策,风险管理,安全保证,安全促进
C. 安全生产,安全管理,运行保证,安全文化
A. 航线放行授权
B. 持有维修人员执照
C. 航线维修授权
D. 具有上岗资质