单选题

A company operates a strict pull system with their suppliers with shipments every 2, 4 and 8 hours. A 3rd party logistics supplier manages all incoming and outgoing shipments. Which of the following delivery performance measures is most likely to incorporate a tolerance to allow for uncontrolled conditions?

A
Required advance shipping notice
B
Required carrier
C
Required date
D
Required time window

答案解析

正确答案:D

解析:

Weather and traffic conditions cannot be controlled, so acceptable time windows need to be provided including tolerance;
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following best describes one of the difficulties in controlling traditional engineering activities?

单选题

Which of the following is not an organizational design form?

单选题

Which of the following is one of the most effective ways to increase productivity?

单选题

During long projects, conflicts are bound to happen. A successful project manager will be skilled to handle conflicts in a way that keeps the project on track and minimizes the emotional fallout. Which of the following is also essential to a successful project?

单选题

Which of the following statements are true regarding corporate strategy?
I. A business needs to complete the strategy development once.
II. It is a dynamic, ongoing process which changes with the business.
III. Corporate objectives are developed by functional area in the company.

单选题

With the full absorption method of accounting, which of the following could occur?
I. Manufacturing could produce inventory and show good performance.
II. Manufacturing could show poor performance by producing only what is sold.

单选题

The first step in selecting and implementing a manufacturing planning and control system is to:

单选题

The graphical display of the interrelationships of the elements of a project and the display of the order in which activities must be performed is called a:

单选题

In order to properly manage a large scale change process, it is important that the project manager develop and maintain a:

单选题

According to Stonebreaker and Leong, there are four approaches to focusing the operation strategy. Which of the following is NOT one of the approaches?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码