In a min-max inventory system, inventory equal to the order point plus a variable order quantity is the

A
Part period inventory level
B
Hybrid inventory level
C
Target inventory level
D
Periodic inventory level

答案解析

正确答案:C

解析:

In a min-max inventory system, the target inventory level is the equivalent of the maximum; The target inventory is equal to the order point plus a variable order quantity;
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

Which of the following are parts of Collaboration Planning, Forecasting and replenishment process (CPFR)?
I. Strategy and Planning
II. Demand Management
III. Tasks such as how to place orders
IV. MPS Software used

单选题

Which of the following are standard priority systems available to a planner?
I. Critical ratio
II. Profit Ratio
III. Start date priority
IV. Due Date priority

单选题

Chris's company has decided to make several different products in varying lot sizes so the factory can make close to the same mix of products that will be sold that day is called what BEST describes Chris's
company manufacturing method?

单选题

Essential to bottoms up re-planning is what?

单选题

At the end of physical inventory counting, the next thing that should be done is what?

单选题

What is the direct reflection of planned and actual lead time?

单选题

If customer demand is 250 a week and production available is 40 hours a week, what is the takt time?

单选题

At the local TV manufacturing shop, they organize all of their machines that make the electronics in one place, one place for the screen manufacturing, and one place for the plastic molding. Each TV follows a
distinct path through the shop for each type of TV that needs to be created. What I the local TV manufacturing's type of production?

单选题

To make a new RV, the MPS scheduler works from the due date and uses full lead time to determine what date to order the materials. The MPS planner is using what type of scheduling?

单选题

An aluminum supplier uses time period safety stock concept. Their policy is to have a half of a week's protection. Their current demand is 1000 units a week. The next period they forecast they will sell 750 units. How many units must be produced in the second time period?

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码