相关题目
The total cost is lowest using economic order quantity is when
Which of the following needs to be considered when creating Safety Stock?
I. Demand Variability
II. Replenishment Lead Time
III. Service Level Required
IV. Balance on Hand
Which of the following are parts of Collaboration Planning, Forecasting and replenishment process (CPFR)?
I. Strategy and Planning
II. Demand Management
III. Tasks such as how to place orders
IV. MPS Software used
Which of the following are standard priority systems available to a planner?
I. Critical ratio
II. Profit Ratio
III. Start date priority
IV. Due Date priority
Chris's company has decided to make several different products in varying lot sizes so the factory can make close to the same mix of products that will be sold that day is called what BEST describes Chris's
company manufacturing method?
Essential to bottoms up re-planning is what?
At the end of physical inventory counting, the next thing that should be done is what?
What is the direct reflection of planned and actual lead time?
If customer demand is 250 a week and production available is 40 hours a week, what is the takt time?
At the local TV manufacturing shop, they organize all of their machines that make the electronics in one place, one place for the screen manufacturing, and one place for the plastic molding. Each TV follows a
distinct path through the shop for each type of TV that needs to be created. What I the local TV manufacturing's type of production?
