The resource profile approach to rough-cut capacity planning is desirable in the manufacture of parts with lengthy lead times because the approach:
答案解析
相关题目
Time fences should be viewed as a way to
Which of the following statements about FAS is true?
The FAS is differentiated from the MPS because
An indication the current manufacturing lead time is longer than that used by RCCP to check the feasibility of the master schedule is
If the MPS is overstated then
Which of the following advanced planning and scheduling techniques is of the most value to master scheduler in developing a valid master schedule?
Which of the following changes is most likely to directly impact the master schedule?
A company produces a line of configurable desks shipped from retailers. Orders are taken at the store and transmitted to the factory daily with delivery promised within 5 to 10 work days, depending on the options. This is achieved by stocking drawers, desk subassemblies and hardware. Which of the following master schedule formats is best for this product family?
Which of the following validations is most likely to be performed form measuring master scheduling performance as it relates to sales and operations planning in a MTS company?
An indication on the sales and operations plan of a MTS company that a chase production strategy is being employed is