相关题目
The sum of the MPS for the items within the product family must be:
The best reason for performing master scheduling at the narrowest point of the product structure is
In an ATO environment, the stocking level where independent demand is planned for the MPS is
Disaggregating the production plan into the MPS is the responsibility of the
An overstated forecast results in an overestimate of which of the following element?
The most common form of international distribution is
The FAS takes place when
A company produces a line of hand-held drills, various types of drill bits hardened to different levels, and a new fixture for different drills. These products are sold to customers through retail stores. Given the common use among these products, the best approach for the master scheduler to take for planning production is
Which of the following criteria would management be most likely to ignore when establishing performance measures for master scheduling?
A company has 20 product families consisting of a total of 500 end items. There is demand for all 500 items over the planning horizon; However, 100 of the items do not have demand for the next 4 weeks. How many items should be master scheduled?
