Objectives of implementing a work cell include which of the following outcomes?

A
Increasing worker satisfaction
B
Organizing resources by raw material type
C
Implementing standard work
D
Sharing common equipment

答案解析

正确答案:A
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

From a master scheduling perspective, mass customization is most similar to

单选题

The main components of Advanced Planning and Scheduling are

单选题

The purpose of a modular BOM includes

单选题

OH Demand Time Fence Planning time fence
Period 1 2 3 4 5 6 7 8
Forecast 20 20 20 20 20 20 20 20
Customer orders 19 20 21 21 25 24 20 18
PAB 15
Safety stock = 10
Lot size = 30
Using the information provided, which periods would have a master schedule quantity?

单选题

A company makes 4 production lines with a variety of features and options offered for each product line. Which of the following tools is most appropriately used to document the product configurations to be built over the next 2 weeks in this situation?

单选题

What is the relationship between the number of week in the backlog and the number of weeks within the MPS time fence?

单选题

A production plan is based on producing the same qty per day. The current month is 20 days and the production plan calls for 8000units. There are 4 models with the following demand. A-3200, B-2400, C-1600, D-800. The sequence for the mixed-model schedule is A-B-C-A-B-D-A-B-C-A. The weekly MPS is:

单选题

Mass customization is the ability to

单选题

A company produces MTO product families that use common work centers configured in a functional layout. Ship date are specified by the customer. It is a stable product line in the maturity stage, but demand is erratic. The master scheduler has ongoing problems maintaining a balanced schedule due to randomly appearing overload conditions among the various work centers. A likely cause of the overload condition is

单选题

An ATO environment using a mixed model production schedule has a bottleneck work center. The best RCCP approach for determining the feasibility of the MPS is to

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码