Specifically accounting for a finishing lead time is an element of
At which of the following levels in the product structure is the FAS in an ATO environment?
Which of the following conditions is necessary before manufacturing can be held responsible for meeting the master schedule?
From a master scheduling perspective, mass customization is most similar to
The main components of Advanced Planning and Scheduling are
The purpose of a modular BOM includes
OH Demand Time Fence Planning time fence
Period 1 2 3 4 5 6 7 8
Forecast 20 20 20 20 20 20 20 20
Customer orders 19 20 21 21 25 24 20 18
PAB 15
Safety stock = 10
Lot size = 30
Using the information provided, which periods would have a master schedule quantity?
A company makes 4 production lines with a variety of features and options offered for each product line. Which of the following tools is most appropriately used to document the product configurations to be built over the next 2 weeks in this situation?
What is the relationship between the number of week in the backlog and the number of weeks within the MPS time fence?
A production plan is based on producing the same qty per day. The current month is 20 days and the production plan calls for 8000units. There are 4 models with the following demand. A-3200, B-2400, C-1600, D-800. The sequence for the mixed-model schedule is A-B-C-A-B-D-A-B-C-A. The weekly MPS is: