Most management processes, such as planning, budgeting, and human resource management would be considered:
答案解析
解析:
相关题目
Which of the following changes would have an impact on the use of a production activity control system?
1. Changing from a batch to a line manufacturing environment;
2. Implementing modular BOM for items with options;
3. Grouping production equipment into focused work cells;
Increased flexibility in order to meet customer demand changes can be achieved by
Material consumed in a pull environment is determined by
Which of the following aspects of a job most determined the day and time when it will be done?
In a job shop environment, which lead time element is typically the longest?
Central point scheduling is a technique that
Which of the following situations is most likely a reason for establishing order priorities with a FAS based on internal measures, rather than on customer-oriented measures?
Which of the following orders will production have the most of for planning and scheduling in an ATO environment?
For a product that has moved from regular production to spare parts supply, which of the following factors is likely to become LEAST important?
It is determined that it is not possible to complete all the jobs at the work center on time. To solve the problem, the dispatcher removes the job which will take the longest and reschedules it so that the remaining jobs will be completed on time. This sequencing techniques is an example of
