In a job shop environment, it may not be possible to convert all areas to a "flow" shop. Wherever possible the "flow" can be accomplished by:
I. Reducing setup times (quick changeover)
II. Reducing or eliminating queue times
III. Lowering defects towards a zero goal
IV. Cross-training workers

A
I and III
B
I, II, and III
C
II, III, and IV
D
I, II, III, and IV

答案解析

正确答案:D

解析:

All of the above statements can improve the flow of a job shop. Reducing setup time allows multiple jobs to be done on the same machine without the machine being down for extended periods. Defect elimination will keep the shop from having to re-manufacture a part because there is poor quality. These changes will allow the shop to flow the jobs from work center to work center.
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码