The system of shared values about what is important and beliefs about how a company works is called the:
答案解析
解析:
相关题目
A small past-due load often exists at a certain work station. Otherwise, past due loads move around the facility based on product volume and mix. This is an indication that the work station
A demand-pull facility produces five versions of an end item with FAS. Which of the following elements must be accounted for when scheduling a dedicated final assembly line?
Loading leveling has which of the following benefits for scheduling?
Which of the following capacity management techniques calculates the capacity at a work center in a time period without considering the capacity available?
Which of the following changes would have an impact on the use of a production activity control system?
1. Changing from a batch to a line manufacturing environment;
2. Implementing modular BOM for items with options;
3. Grouping production equipment into focused work cells;
Increased flexibility in order to meet customer demand changes can be achieved by
Material consumed in a pull environment is determined by
Which of the following aspects of a job most determined the day and time when it will be done?
In a job shop environment, which lead time element is typically the longest?
Central point scheduling is a technique that