The person responsible for driving the sales and operations process should be the:
答案解析
解析:
相关题目
An assembly line consists of a combination of paced automated and manual operations. An element that interferes with achieving an average time is
In Which of the following type of environments is capacity control likely to be of more importance than material control?
Which of the following benefits of setup reduction is most immediate?
A correct statement about the use of a bottleneck is
1 method for increasing throughput is
A piece of equipment is incapable of maintaining process control for longer than 4 hours and has become a bottleneck, due to unforeseen tooling wear. Tool sharpening requires 2 hours to sharpen and move back into production. Which of the following correctives actions should be done first?
Queue, setup, run, wait and move times are components of
Pulling together a cross function team to drive new product design is an example of
When using a six sigma problem solving approach, problems are identified using
When a failure becomes external, four viable mitigation options include