Reducing design cycle time improves which of the following measures?

A
Production throughput
B
ROI-Return on investment
C
Manufacturability
D
Quality

答案解析

正确答案:B
题目纠错
CPIM PART2-供应链资格认证考试

扫码进入小程序
随时随地练习

相关题目

单选题

A number of companies have created electronic scorecards to gather statistics on a variety of topics such as inventory, sales, costs and forecasts. This varying information is often referred to as the:

单选题

Which of the following order-fulfillment strategies has the key demand management take of coordinating information on customer's product needs with engineering?

单选题

A machine supplier realizes that a machine malfunction at a customer's facility would result in expensive downtime and repair, the supplier decides to gather information about and stock repair part that might be needed. This action best represents the concept of:

单选题

Which of the following inventory would be the customer order penetration point in a MTO environment?

单选题

A company wanting to maintain a high level of customer service at the lowest inventory carrying cost should take which of the following action?

单选题

Which of the following inventory accounting methods will minimize inventory at the end of a period of unexpected increasing costs and stable hand inventory balances?

单选题

Which of the following activities identifies common cause variation?

单选题

Which two of the following actions within a change program will lead to improved organization performance?
I. Strengthening commitment through joint diagnosis of business problems;
II. Institutionalizing systems and procedures early in the change process;
III. Using measures that support continuous learning and change;
IV. Using a functional team management approach to reorganize operating units

单选题

In a culturally diverse problem-solving group with varying priorities, a common impediment to achieving the best solution is:

单选题

Which of the following typically are item master data elements?
I. Inventory transactions;
II. Lot-sizing rule;
III. Lead time;
IV. Component part numbers;

关闭登录弹窗
专为自学备考人员打造
勾选图标
自助导入本地题库
勾选图标
多种刷题考试模式
勾选图标
本地离线答题搜题
勾选图标
扫码考试方便快捷
勾选图标
海量试题每日更新
波浪装饰图
欢迎登录试题通
可以使用以下方式扫码登陆
APP图标
使用APP登录
微信图标
使用微信登录
试题通小程序二维码
联系电话:
400-660-3606
试题通企业微信二维码