The RESET test switch is used to erase the fault history. Push the RESET switch while the VERIFY and the green GO lights are on.
答案解析
相关题目
Make sure that the label fully attaches to the surface and that there are no bubbles.
Apply two layers of protective compound to prevent hydraulic fluid damage to the sealant.
It is the responsibility of the airplane owner and the pilot to insure that the airplane is loaded properly.
Overhaul of any or all components in this chapter must be accomplished with data supplied by the component manufacturer.
This paragraph should also explain that, in addition to the established inspections, other inspections may be required by Airworthiness Directives.
To obtain exact performance values from tables, it is necessary to interpolate between the incremental values.
If the bracket touches the plate, remove the unwanted material with a file.
Measure the dimensions with a metal ruler that has graduations in millimeters.
Be careful when you move jet pipes or exhaust cones that have insulating blankets.
If the damage is only to the middle treads, the tire is serviceable.
